Here Ben is working on the partition wall between the living room and new front bedroom and studying how to install double pocket doors.
Ta-da ! I love these doors, they travel whisper quiet and so smooth. I also love them because they were such a bargain at the Re-Store, bevelled glass and frosty designs. All I had to do was paint them, that was last fall, seems like eons ago.
I've been working on crackfill and paint in the 2 old bedrooms that have become one bedroom, and fiddley jobs like filling in the raggety holes left in the hardwood floor where the wall framing once was.
And when I opened this can of paint for the little bathroom it was definitely a "What was I thinking" moment. Hoping when the toilet and vanity move in there, it won't be as awful..
It was a nasty surprise to find the basement floor gravel was 2 inches to high to accomodate the under slab foam insulation and we had to cancel the pour that was to happen a few days ago. It was right last fall, levelled off to a chalk line all around the footing. But over the winter the frost heaved up the compacted gravel , so we had to hire this guy to shovel it out. Eventually we found the buried chalk line marks. Never never build in a Canadian winter !! The concrete pour is now scheduled for next monday.
Ben is tackling the shingling between other jobs.
Here he has started on the band of pointy shingles that will encircle the house. It seems so long ago I was cutting these on the table saw.
I really like the look of this...